August 20, 2026
Drive through Wilson this week and you'll catch the patch crews before you catch the Stilson junction. WYDOT is milling and repaving WY 22 from Jackson to the base of Teton Pass, an estimated schedule running August 10 through September 4, which means the highway is mid-project right now, cones and lane shifts included, with a couple of weeks still to go.
None of that touches the pathway that picks up at Stilson and heads north toward Teton Village. That route was finished years ago, and it's still the fastest way to get anywhere in this corridor without sitting behind a pilot car.
The patching job is the visible one this month, but it isn't the only thing in motion on this stretch of highway. Downtown Wilson is also in the middle of a separate widening project, expanding WY 22 to a three-lane cross section for the full length of town, with the work timed to sync with a future replacement of the vehicle bridge over Fish Creek. No firm completion date has been set publicly for that piece yet. Between the two, the highway through Wilson isn't dealing with a single inconvenience so much as a longer rebuild that the August patching is just one visible chapter of.
| Project | What it affects | Timing |
|---|---|---|
| WY 22 roadway patching | Jackson to the base of Teton Pass, through Wilson | Aug. 10–Sept. 4, 2026 |
| Downtown Wilson widening + future Fish Creek Bridge replacement | Full length of downtown Wilson | Underway, no confirmed end date |
| Stilson Transit Center | Stilson parking and transit hub | In progress, expected complete August 2026 |
That third line matters more than it looks. Stilson is the literal starting point for everything north of town.
While the highway has been catching up, the pathway network on this side of the valley already got built. The Wilson to Stilson Pathway's first phase opened November 4, 2023, running from the Stilson Transit Center to the Teton Raptor Center with an underpass at Wilson School, so the route never has to cross WY 22 at grade. Its second phase, the Fish Creek Pathway Bridge, was targeted for a June 2024 completion and has been carrying riders and walkers since. From Stilson, the pathway continues north on the Moose-Wilson corridor toward Teton Village, the same route locals have been using for years to link Wilson to the ski area without touching the highway.
If you're walking a dog, riding to breakfast, or getting a kid to an afternoon program at the Raptor Center, the route looks like this:
None of that mileage runs through the patch job. It runs beside it.
North of Stilson isn't just a route between construction zones. It's where the actual rhythm of summer here plays out.
Rendezvous Park, known locally as R Park, anchors the corridor: a 40-acre stretch of former gravel pit turned public pond and meadow system, with three ponds open for swimming, fishing, and non-motorized boating. One of those ponds is stocked specifically for anglers 16 and under, catch-and-release only, which matters if you've got kids who want to fish without competing with adults for water. Near the shore, a towering troll sculpture called Mama Mimi, built by artist Thomas Dambo from reclaimed wood, has become the kind of landmark people use for directions rather than art criticism. On clear Thursday evenings, Wyoming Stargazing runs free public sessions here just after sunset, telescopes pointed at whatever the sky is offering that week.
A little further along, the Teton Raptor Center runs its Avian Experience programs out of the restored Moseley/Hardeman Barn, typically Wednesday through Saturday, with a handful of resident raptors rotating through depending on who's currently in rehabilitation. It's the kind of stop you take out-of-town guests to see once and then find yourself back at on a random Tuesday because the schedule happened to line up.
Aspens Market sits roughly at the midpoint between Wilson and Teton Village, the spot riders and drivers both pull into for coffee or a sandwich, or Wyoming beef from local ranches if you're headed home instead of out. Nora's Fish Creek Inn, serving breakfast, lunch, and dinner since 1982, is still the anchor meal on this side of the valley, the kind of place that doesn't need to change to stay full.
None of this is new if you've lived here a while. What's worth noticing is that while the highway through town gets patched, widened, and rebuilt in stages this year, the pathway that actually carries daily life north toward the ponds, the birds, and breakfast has been finished and running since 2024, untouched by any of it.
That's the part worth remembering the next time you're stopped behind a pilot car on WY 22. There's already a way around it, and it's been there for two summers.
If you've been thinking about what this stretch of the valley is worth, or what it would take to make it home, Meredith Landino has spent decades watching this exact corridor change and knows it block by block, path by path. Let's Connect.
Stay up to date on the latest real estate trends.
Jackson Hole Real Estate
Curated suggestions by Meredith Landino